Project name项目名称 | New Nangang Bridge新南港大桥 |
Construction unit建设单位 | China Railway Eleventh Bureau Group Co., Ltd.中铁十一局集团有限公司 |
Project description项目描述 | The Minhou New Nangang Bridge and its connection project started from Liufenzhou, Nanyu, Minhou County, and passed through Liufenzhou Village. The newly built Nangang Bridge crossed Dazhangxi and Chencuo River, temporarily connected to the planned Nantong Avenue, and finally wholesaled in Haixi. Market Road A, with a total length of 2.57 kilometers, of which the bridge is about 1,640 meters, is constructed according to the standard of Class I highway and urban Class I main road, with a design speed of 60 km/h; in order to strengthen the connection between this project and Provincial Highway 203, the construction will be carried out simultaneously. The connecting line of Jiangbin Road is 3.6 kilometers. The starting point of the connecting line of Jiangbin Road is connected with the Nanyu auxiliary road of the new Nangang Bridge. The original Nanyu Avenue is used for reconstruction and expansion, and finally the bridgehead of the existing Nangang Bridge is taken into account by the first-class highway and the city's first-class main road. Standard construction with a design speed of 60 km/h.闽侯新南港大桥及接线工程起于闽侯县南屿六十分洲互通,经六十分洲村,新建南港大桥跨越大樟溪、陈厝河,暂接规划的南通大道,终于海西批发市场A号道路,全长2.57公里,其中桥梁约1640米,按一级公路兼顾城市Ⅰ级主干道标准建设,设计速度60公里/小时;为加强本项目与省道203线的衔接,同步建设江滨路连接线3.6公里,江滨路连接线起点与新南港大桥的南屿辅路相接,利用原南屿大道改扩建,终于现有南港大桥桥头,按一级公路兼顾城市Ⅰ级主干道标准建设,设计速度60公里/小时。 |
Supply product供应产品 | Squeezing agent,squeezing material,grouting material压浆剂、压浆料、灌浆料 |