Project name项目名称 | Xiangpu Railway FJ-2 standard paving project向莆铁路FJ-2标铺架项目 |
Construction unit建设单位 | China Railway Tenth Bureau Group Co., Ltd.中铁十局集团有限公司 |
Project Description项目简介 | Xiang (Tang) Pu (Tian) Railway is located in eastern Jiangxi and central Fujian, starting from Nanchang City, Jiangxi Province in the west. The branch from Ning, Jiangle, Shaxian, Youxi to Yongtai is introduced into Fuzhou Station of Waifu Railway and Putian Station of Fuxia Railway respectively. The main line is about 603.6 kilometers long, of which: 384.265 kilometers in Fujian Province, including Nanchang (Xiangtang) , Fuzhou hub and Putian area supporting work, as well as the new Sanming Station to the Pu Railway and the Yingxia Railway in the direction of Nanping, a total of 24 stations. The Xiangpu Railway FJ-2 Standard Paving Project Department of China Railway Tenth Bureau undertakes the task of laying tracks for the 381.8 km main line of Xiangpu Railway. At the same time, there are 6 stations in Jiangle, Xiamao, Sanmingbei, Youxi, Zhongxian and Changqing. The station yard track laying, and the 1533 hole beam erection task. 向(塘)莆(田)铁路位于赣东和闽中地区,西起江西省南昌市,自南昌(向塘)枢纽新南昌站引出,经江西抚州、南城、南丰,福建建宁、泰宁、将乐、沙县、尤溪至永泰分岔,分别引入外福铁路福州站和福厦铁路莆田站,正线全长约603.6公里,其中:福建省境内384.265公里,包括南昌(向塘)、福州枢纽和莆田地区配套工作,以及新三明站向莆铁路与鹰厦铁路南平方向的联络线工程,共设24个车站。 中铁十局向莆铁路FJ-2标铺架项目部承担向莆铁路381.8公里正线铺轨任务,同时,还有将乐、夏茂、三明北、尤溪、中仙、长庆共6个站的站场铺轨,以及1533孔的架梁任务。 |
Supply product供应产品 | Squeezing agent,grouting material压浆剂、灌浆料 |