Project name项目名称 | Houxi Beam Making Field of Fuxia Railway福厦铁路后溪制梁场 |
Construction unit建设单位 | China Railway Bridge Group Co., Ltd.中铁大桥局集团有限公司 |
Project Description项目简介 | The three super bridges of Houxi, Xicai and Zhongyacheng of Fuxia Railway undertaken by the Houxi Beam Making Field of Fuxia Railway have a total length of 3.8 kilometers, and 104-hole main line box beams need to be erected. On August 7, 2008, the main lines of the three extra-large bridges were fully connected.福厦铁路后溪制梁场承担的福厦铁路后溪、西蔡和中亚城三座特大桥总长3.8公里,需要架设104孔正线箱梁。三座特大桥正线于2008年8月7日全面实现架通。 |
Supply product供应产品 | Grouting material灌浆料 |