Project name项目名称 | Meizhou Bay South Coast Line Railway Branch湄洲湾南岸线铁路支线 |
Construction unit建设单位 | China Railway Tenth Bureau Group Co., Ltd.中铁十局集团有限公司 |
Project Description项目简介 | The Fu project of the Meizhou Bay South Bank Railway Branch Line includes Xianyou Station (including Xianyou Station) to Douwei Port Area on the South Bank of Meizhou Bay, including related supporting projects. The entire branch line connects and leads from Xianyou Fengting Station of Fuxia Railway, connects to Xiaocuo Station of Zhangquan Xiao Railway via Tiandun in Quangang District, and then leads out to Douwei Port District, with a total length of about 39 kilometers, almost all of which are in Quanzhou City . The total investment of the project is about 1.37 billion yuan, which is jointly raised by Nanchang Railway Bureau, Hui'an County Government and Quangang District Government. The main technical standards of the branch line of the South Bank of Meizhou Bay are: national class II, single line; minimum curve radius of 600 meters; design speed of 120 kilometers per hour; electric traction; The railway will be used exclusively for freight transportation and serve the port area and coastal industries. After completion, it will mainly undertake the railway collection and distribution tasks from the Douwei operation area of Quanzhou Port to the technical operation station. It will play a huge role in the petrochemical base in particular. , Douwei, Xiutu 3 expressway branch lines to Fuzhou-Xiamen Railway, to Pu Railway to Fuzhou direction of transportation tasks.湄洲湾南岸铁路支线福工程包括仙游站(含仙游站)至湄洲湾南岸斗尾港区,含相关配套工程。整条支线从福厦铁路仙游枫亭站接轨引出,经泉港区田墩接入漳泉肖铁路肖厝站,再引出至斗尾港区,全长约39公里,全线几乎都在泉州市境内。项目总投资约13.7亿元,由南昌铁路局、惠安县政府、泉港区政府共同筹措,其余资金向国内银行贷款筹措。湄洲湾南岸铁路支线的主要技术标准为:国家Ⅱ级、单线;最小曲线半径600米;设计时速120公里;电力牵引;牵引质量4000吨,到发线有效长度850米,继电半自动闭塞。该铁路将作为货运专用,为港区和临海工业服务,建成之后主要承担泉州港斗尾作业区至技术作业站的铁路集疏运任务,尤其将为石化基地发挥巨大作用,另外还承担肖厝、斗尾、秀涂3条高速公路支线到福厦铁路、向莆铁路福州方向的运输任务。 |
Supply product供应产品 | Squeezing agent,expansion agent,grouting agent压浆剂、膨胀剂、灌浆料 |