Project name项目名称 | Jinjiang Shujie Road Phase II Project晋江疏解路二期工程 |
Construction unit建设单位 | CCCC First Highway Engineering Bureau Co., Ltd.中交第一公路工程局有限公司 |
Project description项目描述 | Shujie Road is a convenient main road between Nan'an, Jinjiang and Shishi cities and counties. It adopts the first-class highway standard, with a roadbed width of 50 meters and a designed driving speed of 80 km/h. The main line has a total length of 14.8 kilometers, of which 75% of the construction tasks of the first phase have been completed, and it is planned to be completed and opened to traffic in June next year. The second phase, which is currently being organized and implemented immediately, starts from the vicinity of Shanzai Village, Cizao Town, G324 Line, and ends at Ganshi Village, Neikeng Town, with a total length of 6.65 kilometers and an estimated investment of 250 million yuan. After the project is completed, it will be connected with the first phase, which is of great significance to promoting the rapid distribution of people and logistics at Jinjiang Station of Fuxia Railway, promoting the construction and development of Neikeng logistics area, and accelerating the development of magnetic stoves, Neikeng and even the central and western parts of Jinjiang.疏解路是南安、晋江、石狮市域县际间的一条便捷主干道,采用一级公路标准,路基宽度50米,设计行车速度80公里/小时。主线全长14.8公里,其中一期已完成75%的建设任务,计划明年6月建成通车。当前马上组织实施的二期起于G324线磁灶镇山仔村附近,终于内坑镇柑市村,全长6.65公里,估算投资2.5亿元。项目建成后,将与一期连接,对促进福厦铁路晋江站人流、物流快速集散,促进内坑物流区建设发展,加快磁灶、内坑乃至晋江中西部发展,具有重要意义。 |
Supply product供应产品 | Superplasticizer,squeezing material减水剂、压浆料 |