Product name项目名称 | XQNQ-5 standard of Ningquan section of Xingquan Railway兴泉铁路宁泉段XQNQ-5标 |
Construction unit建设单位 | China Railway Tunnel Group Three Co., Ltd.中铁隧道集团三处有限公司 |
Project description项目描述 | The Ninghua-Quanzhou section of the newly-built Xingguo-Quanzhou line is located in the southwestern part of Fujian. The line starts from Ninghua Station in the west, passes through Qingliu County, Mingxi County, Yongan City, Datian County in Sanming City, Dehua County, Yongchun County, Anxi County and Nan'an City in Quanzhou City, and finally ends at Quanzhou Station. The new main line of the project is 302.065km, including related projects in Yongan area and Quanzhou area. The main technical standard of the line is the National Railway Class I single-track electrified railway, the passenger and cargo are on the same line, the designed passenger train speed is 160km/h, and there are 34 stations on the whole line. The project owner is Xiangpu Railway Co., Ltd. The line of this bidding section starts from the roadbed section (DK301+320) between the Lingdou No. 2 Bridge and the entrance of the Nanpingshan Tunnel, and ends at the end of the Hua'an Bridge with a small mileage (not included) (DK334+594.09), located in Datian, Sanming City, Fujian Province Within the county, the main line is 33.30km long, of which 6 tunnels are 27.412km long, and 11 bridges are 3.54km long (including 2 extra-large bridges, 2.2km long). 新建铁路兴国至泉州线宁化至泉州段位于闽西南地区。线路西起宁化站,经三明市的清流县、明溪县、永安市、大田县,泉州市的德化县、永春县、安溪县和南安市等市县,终至泉州站。工程新建正线302.065km ,另含永安地区及泉州地区相关工程。线路主要技术标准为国铁I级单线电气化铁路,客货共线,设计旅客列车行车速度160km/h,全线共设车站34 个。项目业主为向莆铁路股份有限公司。 本标段线路起于岭兜2号大桥至南屏山隧道进口之间的路基段(DK301+320),终于华安大桥小里程台尾(不含)(DK334+594.09),位于福建省三明市大田县境内,正线长33.30km,其中隧道6座长27.412km,桥梁11座长3.54km(其中:特大桥2座2.2km)。 |
Supply product供应产品 | Micro-expansion grouting material, grouting material, squeezing material微膨胀注浆料、灌浆料、压浆料 |