Project name项目名称 | Quning Railway Fujian Section Project衢宁铁路福建段项目 |
Construction unit建设单位 | China Railway Fifth Bureau Group Sixth Engineering Co., Ltd.中铁五局集团第六工程有限责任公司 |
Project description项目描述 | This project undertakes the construction of the new Quzhou-Ningde Railway (Fujian section) in front of the station. The main line has a total length of 172.056km. There are 58 large and medium bridges with a total length of 22,414.40 meters on the main line (excluding 12-6643.8 meters of connecting lines and running lines). meters), accounting for 13.0% of the length of the main line, and 48.5 main line tunnels with a length of 124.979km (including the Changpugang Tunnel with a total length of 5939.1m and 1220m in Fujian Province), accounting for 72.6% of the main line. The new Quzhou-Ningde Railway (Fujian section) project has a total of 14 stations, including 1 existing station and 14 new stations, with 876 beams and beams.本项目承建新建衢州至宁德铁路(福建段)站前工程,正线线路全长172.056km,正线共设有大中桥58座22414.40延米(不含联络线及走行线12座-6643.8延米),占正线线路长度的13.0%,正线隧道48.5座124.979km(其中菖蒲岗隧道全长5939.1m,福建省内1220m),占正线72.6%。新建衢州至宁德铁路(福建段)工程共设14个车站,其中既有车站1个,新建车站14个,制、架梁876孔。
|
Supply product供应产品 | Superplasticizer减水剂 |