Fujian Section of Quning Railway衢宁铁路福建段

Projects > Railway Engineering > Fujian Section of Quning Railway衢宁铁路福建段

Fujian Section of Quning Railway衢宁铁路福建段

Project name项目名称

Quning Railway Fujian Section Project衢宁铁路福建段项目

Construction unit建设单位

China Railway Fifth Bureau Group Sixth Engineering Co., Ltd.中铁五局集团第六工程有限责任公司

Project description项目描述

This project undertakes the construction of the new Quzhou-Ningde Railway (Fujian section) in front of the station. The main line has a total length of 172.056km. There are 58 large and medium bridges with a total length of 22,414.40 meters on the main line (excluding 12-6643.8 meters of connecting lines and running lines). meters), accounting for 13.0% of the length of the main line, and 48.5 main line tunnels with a length of 124.979km (including the Changpugang Tunnel with a total length of 5939.1m and 1220m in Fujian Province), accounting for 72.6% of the main line. The new Quzhou-Ningde Railway (Fujian section) project has a total of 14 stations, including 1 existing station and 14 new stations, with 876 beams and beams.本项目承建新建衢州至宁德铁路(福建段)站前工程,正线线路全长172.056km,正线共设有大中桥5822414.40延米(不含联络线及走行线12-6643.8延米),占正线线路长度的13.0%,正线隧道48.5124.979km(其中菖蒲岗隧道全长5939.1m,福建省内1220m),占正线72.6%。新建衢州至宁德铁路(福建段)工程共设14个车站,其中既有车站1个,新建车站14个,制、架梁876孔。

 

Supply product供应产品

Superplasticizer减水剂